Estimate wall units, openings, mortar, cap blocks, base gravel, and planning cost before buying block or comparing a masonry quote.

Ready now

Choose the masonry material

Quick answers

Block vs brick for the same 100 sq ft wall

The same 25 ft x 4 ft wall with no openings, estimated by each calculator with its default 5% waste. Brick takes about six times as many units as block, and more mortar, because every unit is smaller.

Wall unit Units Mortar
Concrete block (8x8x16 CMU) About 1.125 blocks per sq ft with 3/8 in joints. 119 blocks 4 bags
Modular brick About 7 bricks per sq ft with 3/8 in joints. 735 bricks 6 bags

Retaining wall example

A 25 ft long, 3 ft high segmental wall with 12 x 6 in blocks is 6 courses of 25 blocks: about 158 wall blocks, 25 caps, and 0.6 tons of base gravel. Walls over about 4 ft usually need engineering — check locally.

Retaining wall calculator

Method

Masonry estimates start with wall area, then subtract openings

Wall area

length ft x height ft - openings

Units

ceil(adjusted area / unit coverage)

Mortar and base

round up bags, base gravel, and cap pieces separately

Sources

Sources checked

Written by

MeasureTwice Editorial

DIY estimating and home-improvement research

Checked against

Bag yields checked against Quikrete and Sakrete product specs; price ranges against published concrete cost guides.

How we check our numbers

Last updated: October 4, 2026

Estimate only. This calculator is not a quote. Verify product yield, price, delivery minimums, and local conditions with your supplier or contractor before buying materials.

FAQ

Masonry calculator questions

Quick answers for block, brick, mortar, openings, and retaining wall materials.

How many blocks or bricks do I need for 100 square feet of wall? +

A 100 sq ft wall takes about 119 standard 8x8x16 concrete blocks or about 735 modular bricks, each including a 5% waste allowance. Block needs roughly 4 bags of mortar and brick roughly 6.

Why is concrete block under masonry? +

Concrete block walls are masonry work. The calculator estimates CMU blocks, mortar, wall area, openings, and material cost.

What is different between brick and block estimating? +

Brick estimating is usually based on bricks per square foot, while block estimating counts larger CMU units and mortar bags after openings are removed.

Do retaining walls need base gravel? +

Most segmental retaining wall projects need a compacted base layer and often drainage aggregate. Verify wall height and engineering requirements locally.