Primary material
62 bags
80 lb concrete mix
Use the calculated bag count as your buying starting point, then verify yield and pallet limits with the store.
Concrete wall calculator
Enter wall length, height, thickness, and waste allowance to estimate cubic yards, bag count, and rough material cost.
20 ft x 2 ft x 8 in
1.09 yd³
49 bags at 80 lb
Formula
L x H x T
Thickness converted to feet
Best for
Walls
Poured walls and wall stems
Estimated result
Concrete needed
1.36 yd³
36.7 ft³ with waste
80 lb bags
62
60 lb bags
82
Estimate only, not a quote. Verify product yield and price with your supplier.
Quick wall answers
20 ft short wall
20 ft x 2 ft x 8 in
1.09 yd³
49 bags at 80 lb with default 10% waste
40 ft foundation wall
40 ft x 4 ft x 8 in
4.35 yd³
196 bags at 80 lb with default 10% waste
Retaining wall stem
30 ft x 3 ft x 10 in
3.06 yd³
138 bags at 80 lb with default 10% waste
Openings and forms
This page estimates a solid rectangular wall. For window openings, pilasters, keys, or stepped wall sections, calculate each piece separately.
Shopping list
Use the calculated quantities as a starting cart, then compare store availability, delivery fees, pallet limits, and local ready-mix minimums before buying.
Primary material
62 bags
80 lb concrete mix
Use the calculated bag count as your buying starting point, then verify yield and pallet limits with the store.
Large pours
Ready-mix quote check
For high bag counts, compare the bagged route against local ready-mix minimums, delivery, access, and unload time.
Optional base
Gravel base
Base depth is project-specific. Estimate it separately before adding bags or bulk gravel to the order.
Optional forms
Forms and stakes
Plan lumber, stakes, screws, release, and bracing around the perimeter and any step-downs or curves.
Store buttons open retailer search results for now. Confirm exact product yield, pickup, delivery, and pallet rules before ordering.
Advertising and affiliate disclosure
MeasureTwice may earn from display ads, retailer links, or contractor lead partners. Calculator results and formulas are not changed to favor a vendor. Read the disclosure.
Shopping ad slot
Reserved space for store links, local supplier offers, display ads, or quote CTAs.
Advertising and affiliate disclosure
MeasureTwice may earn from display ads, retailer links, or contractor lead partners. Calculator results and formulas are not changed to favor a vendor. Read the disclosure.
Formula shown
1. Convert thickness to feet
thickness ft = thickness in / 12
2. Calculate wall volume
cubic feet = length ft x height ft x thickness ft
3. Add waste and estimate bags
bags = ceil(cubic feet x (1 + waste) / bag yield)
Wall edge cases
Tall walls, retaining walls, basement walls, and walls with soil pressure need more than a volume estimate. Reinforcement, form bracing, drainage, and footing design should be reviewed before pouring.
Sources
Reviewed for estimating accuracy
Last updated: June 20, 2026
Related calculators
Related tools ad slot
Reserved space for store links, local supplier offers, display ads, or quote CTAs.
Advertising and affiliate disclosure
MeasureTwice may earn from display ads, retailer links, or contractor lead partners. Calculator results and formulas are not changed to favor a vendor. Read the disclosure.
FAQ
Answers for wall volume, openings, bags vs ready-mix, and structural limitations.
Multiply wall length in feet by wall height in feet by wall thickness in feet. This calculator lets you enter thickness in inches, converts it to feet, then adds the entered waste allowance.
For a 20 ft long, 2 ft high, 8 inch thick wall, the calculator estimates about 1.09 cubic yards with the default 10% waste allowance, or about 49 bags of 80 lb concrete mix. You can edit waste for your formwork and jobsite.
This first version estimates a solid rectangular wall. For large openings, estimate the opening volume separately and subtract it, or use a project-specific takeoff.
No. It estimates quantity only. Wall thickness, reinforcement, drainage, bracing, formwork, footing, and retaining-wall loads need project-specific engineering or contractor review.
Most full-height or long poured walls are better suited to ready-mix because placement timing and consistency matter. Bags are more realistic for small stem walls or repairs.